Multiple Choice
Refer to the exhibit. After a failover occurs, which two actions must be performed on Switch-B to manually preempt the operational primary role back to Switch-A? (Choose two.)
A) Configure the local vPC role priority to have a lower value than Switch-A.
B) Configure the local vPC role priority to have a higher value than Switch-A.
C) Disable and then re-enable the vPC peer-keepalive link.
D) Configure the local vPC role priority to have the same value as Switch-A.
E) Disable and then re-enable the vPC peer link.
Correct Answer:
Verified