A proposed solution includes the HPE Moonshot-4QSFP+ Uplink Modules. The customer informs the architect that the planned purchase of 40GbE switches has been postponed. The customer still intends to purchase 40GbE switches within a year, but in the meantime, existing 10GbE switches will be used. These switches are HPE network switches located 25 meters from the location of the racks that house the HPE Moonshot Solution. The customer needs 30Gb/s bandwidth. Which action should the architect recommend to allow the customer to deploy the solution immediately and easily take advantage of 40GbE when deployed later?
A) Swap in HPE Moonshot-16SFP+ Uplink Modules
B) Replace the QSFP+ transceivers with SFP+ transceivers
C) Add QSP+/SFP+ adaptor kits to the design
D) Replace the DAC cables with DAC splitter cables
Correct Answer:
Verified
Q79: View the Exhibit. Q80: What is one advantage of hard partitioning, Q81: An architect is presenting a file-based transcoding Q82: A customer is considering an object storage Q83: An architect is discussing advantages of the Q85: A customer requires a server infrastructure update Q86: A customer plans to add a high Q87: A customer needs to integrate an existing Q88: An architect needs to determine whether a Q89: A customer needs a mission critical SQL![]()
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents