A customer is planning an HPE Synergy solution with 20 frames and needs to minimize the number of management ports that are required to connect the frames into the existing management network. Which procedure should the integrator use to address the customer's concern?
A) Connect the RJ-45 front ports of each frame to an external switch. Then, connect the uplink from the external switch into the customer's management network.
B) Connect FLMs from all frames to two external switches for redundancy. Then, connect the two uplinks from the two switches into the customer's management network.
C) Connect the RJ-45 front ports of each frame to two external switches for redundancy. Then, connect the uplink from the two switches into the customer's management network.
D) Connect FLMs from all frames into a management ring. Then, connect the management ring to the customer's management network using two uplinks.
Correct Answer:
Verified
Q7: How many redundant fabrics are supported in
Q8: An integrator prepares deployment documents with the
Q9: An integrator is installing three Synergy frames
Q10: Which HPE Synergy D3940 storage module configuration
Q11: A customer has a datacenter with 3-frame
Q13: A customer tries to revert a data
Q14: How can an integrator use an HPE
Q15: A customer needs to evaluate Image Streamer
Q16: A customer has forgotten the password for
Q17: A customer needs to aggregate uplink ports
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents