Solved

A Customer Has Received a Second Frame for Their HPE

Question 24

Multiple Choice

  A customer has received a second frame for their HPE Synergy environment. The customer has added the second frame to the rack and correctly cabled the power and management ring. Based on the design shown, which changes need to be made to the configuration to ensure high availability? (Choose two.)  A)  Split the management uplinks across both frames B)  Configure high availability in vCenter for the HPE OneView appliance C)  Configure high availability on the Frame Link Modules D)  Enable high availability in the Settings of the Composer E)  Move one of the Composers to the second frame A customer has received a second frame for their HPE Synergy environment. The customer has added the second frame to the rack and correctly cabled the power and management ring. Based on the design shown, which changes need to be made to the configuration to ensure high availability? (Choose two.)


A) Split the management uplinks across both frames
B) Configure high availability in vCenter for the HPE OneView appliance
C) Configure high availability on the Frame Link Modules
D) Enable high availability in the Settings of the Composer
E) Move one of the Composers to the second frame

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents