Refer to the exhibit.
A customer with the design shown needs to perform an in-place upgrade to its environment to scale the two-frame single homed Multimodule Link Aggregation Group (MLAG) configuration to a three-frame configuration. The new frame needs to provide a redundant 20Gb connection for the compute module ports in Fabric 3. Which interconnect modules should the integrator use in Frame 3?
A) HPE Virtual Connect SE 40Gb F8 module in bay 3 and HPE Virtual Connect SE 40Gb F8 Module in bay 6
B) HPE Synergy 10Gb Interconnect Link Module in bay 3 and HPE Synergy 10Gb Interconnect Link Module in bay 6
C) HPE Synergy 20Gb Interconnect Link Module in bay 3 and HPE Synergy 20Gb Interconnect Link Module in bay 6
D) HPE Synergy 20Gb Interconnect Link Module in bay 3 and HPE Synergy 10Gb Interconnect Link Module in bay 6
Correct Answer:
Verified
Q40: A customer has forgotten the password for
Q41: A customer needs to deploy additional management
Q42: A customer wants to add nodes to
Q43: Is this a correct statement about how
Q44: A customer is unable to boot to
Q46: A customer needs a new infrastructure solution
Q47: A customer using HPE Synergy is unable
Q48: Is this a reason to use VVols
Q49: A customer has a Hyper-V and ESXi
Q50: During a first-time installation of HPE Synergy,
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents