A customer needs to upgrade an HPE Synergy 12000 frame with an HPE Virtual Connect SE 32Gb Fibre Channel (FC) Module. Which steps must the integrator take to install the upgrade?
A) Modify the Synergy 40Gb F8 Logical Interconnect Group (LIG) , and add the FC uplink set and storage networks.
B) Create one redundant Logical Interconnect Group (LIG) with two uplink sets, one for SAN-A and one for SAN-B.
C) Create two new Logical Interconnect Groups (LIGs) that are non-redundant Side-A/Side-B, one for SAN-A and one for SAN-B.
D) Edit the Enclosure Group and specify HPE Virtual Connect SE 32Gb FC Module in interconnect bays 1 and 2.
Correct Answer:
Verified
Q51: Which policy can an integrator apply when
Q52: A customer is planning to deploy OneView
Q53: A customer needs a new infrastructure solution
Q54: Which component of the HPE Synergy solution
Q55: A Synergy integrator is unable to assign
Q57: Is this a typical use case for
Q58: A customer has an HPE SimpliVity Federation
Q59: Is this an essential component to include
Q60: A customer needs to deploy a farm
Q61: A customer has a Microsoft Hyper-V virtualized
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents