A systems administrator needs to add a VLAN to a network set to support a new application. They have added the network to the upstream switch and the Logical Interconnect Group in HPE OneView but traffic is not passing. What is the most likely cause of the problem?
A) Intelligent Management Center (IMC) has not been updated via REST
B) The upstream switch doesn't have the VLAN enabled
C) The administrator needs to update the Logical Interconnects from the Logical Interconnect Group
D) The administrator failed to update the state change message bus
Correct Answer:
Verified
Q61: Which tool enables you to manage ML/DL
Q62: When configuring network parameters in HPE OneView
Q63: An administrator is creating server profiles in
Q64: Which parameter does the server profile assign
Q65: Which type of API is supported by
Q66: What are two situations in which you
Q67: Which HPE storage products can be provisioned
Q69: Your customer has multiple c7000 enclosures that
Q70: You receive an alert stating that the
Q71: What will occur if you modify the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents