Refer to the exhibit.
The exhibit shows the current plan for a wired network upgrade. As much as possible, the customer wants to flatten the architecture and avoid recabling. However, each Building 2 switch must also maintain connectivity to the core if one link fails. What should the architect propose to meet the customer requirements?
A) Use two additional 2930F switches to act as an aggregation layer for Building 2; connect them to the core on 40 GbE connections.
B) Connect each Building 2 switch directly to the core on a single fiber strand through the use of SFP+-SR transceivers.
C) Combine the switches in each Building 2 closet as a VSF fabric; establish two 10 GbE connections to the core per fabric.
D) Extend additional fiber between the buildings so that each Building 2 switch can have a direct 10 GbE connection to the core.
Correct Answer:
Verified
Q20: Refer to the exhibits. Exhibit 1 shows
Q21: What is one important guideline for antenna
Q22: An architect plans to propose two Aruba
Q23: Refer to the exhibit. Q24: A customer requires high availability for wireless Q26: An architect proposes an Aruba wireless solution Q27: For which scenario does the Aruba backplane Q28: A customer has several clusters of Aruba Q29: A customer needs an 802.11ac upgrade for Q30: A plan includes these security settings for![]()
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents