An organization is setting up a backup and restore system in AWS of their in premise system. The organization needs High Availability(HA) and Disaster Recovery(DR) but is okay to have a longer recovery time to save costs. Which of the below mentioned setup options helps achieve the objective of cost saving as well as DR in the most effective way?
A) Setup pre-configured servers and create AMIs. Use EIP and Route 53 to quickly switch over to AWS from in premise.
B) Setup the backup data on S3 and transfer data to S3 regularly using the storage gateway.
C) Setup a small instance with AutoScaling; in case of DR start diverting all the load to AWS from on premise.
D) Replicate on premise DB to EC2 at regular intervals and setup a scenario similar to the pilot light.
Correct Answer:
Verified
Q802: A company is running a line-of-business (LOB)
Q803: To serve Web traffic for a popular
Q804: A large company in Europe plans to
Q805: A company wants to host its website
Q806: Your fortune 500 company has under taken
Q808: What is the name of licensing model
Q809: A retail company processes point-of-sale data on
Q810: A company is using AWS CodePipeline for
Q811: A company is serving files to its
Q812: A company is migrating its on-premises systems
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents