Redhat Linux Enterprise 6 cp command is used to complete the operating system data migration. What steps are needed to verify confirmation transfer into Power? (Multiple choice.)
A) Check if the size of the migrated file is the same as the original data.
B) Check if the number of documents corresponds to the original data
C) Check if each file with read and write permissions corresponds to the original data
D) Whether the time for reviewing the case file corresponds to the original data.
Correct Answer:
Verified
Q22: A VTL6900-I system, the backup server connected
Q23: Two sets of OceanStor unified storage with
Q24: Which of the following copy is supported
Q25: On the Windows Server 2008 R2 system
Q26: Which of the following information about the
Q28: The disaster recovery plan of Huawei means
Q29: Which of the following best practice description
Q30: HPUX system has two user volume groups:
Q31: A N8500 (V200R001) clustered NAS system with
Q32: When a customer uses simpana software, CS
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents