In the storage disaster recovery and backup solution, the RPO of a storage product is 30 minutes and the RTO is 15 minutes. Which of the following statements are correct?
A) When the storage system is faulty, the time difference between the production site and the DR site may be 45 minutes.
B) The duration from the time when a fault occurs to the time when the service is suspended to the time when the service is recovered may be 45 minutes.
C) When the storage system is faulty, the time difference between the production site and the DR site may be 30 minutes.
D) The period from the time when a fault occurs to the time when the service is suspended to the time when the service is recovered may be 15 minutes.
Correct Answer:
Verified
Q18: ITIL best practices refer to the advanced
Q19: In the cloud data center migration scenario,
Q20: Which of the following storage device are
Q21: Which of the following statements about the
Q22: In the data center active-active solution, the
Q23: In the data center storage and backup
Q24: After the recovery policy of Huawei DR
Q25: Data backup can be used to prevent
Q26: Which of the following items need to
Q28: To prevent data loss caused by misoperations,
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents