A technician needs to add ten additional Ethernet ports to a small office network. A new basic function switch is added. Hosts connected to the new switch are unable to see any computers on the network other than those connected to the new switch. Which of the following should the technician perform to ensure the hosts on the new switch can communicate with the existing network?
A) Replace the new switch with a hub to ensure Layer 1 connectivity on the new network segment.
B) Move the straight-through Ethernet cable connecting the switches to the first port on both switches.
C) Connect the switches with a cable that has a TIA/EIA 586A wired connector end and a TIA/EIA 586B wired end.
D) Add a second cable connecting the switches for redundancy and disabling STP on both switches.
Correct Answer:
Verified
Q239: A network administrator wants to connect to
Q240: A development team has been testing a
Q241: A network technician has been asked to
Q242: A network engineer is trying to determine
Q243: Users report that the network is slow.
Q245: Before upgrading the firmware on several routers,
Q246: Which of the following protocols is used
Q247: Log files show the admin user has
Q248: Which of the following is an object
Q249: A network technician is assisting a user
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents