A contractor is setting up and configuring conference rooms for a convention. The contractor sets up each room in the conference center to allow wired Internet access going to individual tables. The contractor measured the distance between the hotel's patch panel to the jack, and the distance is within Cat 5e specifications. The contractor is concerned that the room will be out of specification if cables are run in each room from the wall jacks. Which of the following actions should the contractor take to ensure the cable runs meet specifications and the network functions properly?
A) Place a switch at the hotel's patch panel for connecting each room's cables
B) Place a switch on each table to ensure strong connectivity
C) Place repeaters between the patch panel and the rooms
D) place a switch at the wall jack and run the cables in the room from there
Correct Answer:
Verified
Q548: A network technician is configuring user access
Q549: A system administrator receives reports from users
Q550: A technician is troubleshooting a workstation's network
Q551: A user reports that a laptop cannot
Q552: A new building needs to be joined
Q554: A network security technician observes multiple attempts
Q555: Which of the following BEST describes the
Q556: Management has requested that services be available
Q557: Which of the following should be performed
Q558: Which of the following physical security controls
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents