A certain rack mounted blade server chassis needs 3-phase power for operation. There is currently only single-phase power coming into the room. The administrator needs to:
A) call an electrician to wire the single-phase power into 3-phase power.
B) use a single-phase UPS to power the 3-phase server.
C) call an electrician to see if 3-phase power can be brought into the room.
D) use an adapter to configure the server to use single-phase power.
Correct Answer:
Verified
Q570: A user is reporting that access to
Q571: A system administrator has determined that more
Q572: When attempting to diagnose service access issues
Q573: A system administrator is tasked with dividing
Q574: For a technician to test network connectivity
Q576: As a best practice, which of the
Q577: A server technician is performing a server
Q578: The IT director instructed the systems administrator
Q579: A server technician needs to connect two
Q580: A server has 500GB of data that
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents