A technician needs to replace a hot swap coolong fan in a server. The server resides at U26 of a 42U rack that is fully populated with servers. The technician is unable to remove the server from the rack without powering off the server first. Which of the following should have been installed at the time the server was installed in the rack?
A) A UPS
B) Cable management arms
C) Server rail kits
D) Management modules
Correct Answer:
Verified
Q613: Which of the following is an example
Q614: Network devices between two firewalls are included
Q615: A technician has installed an additional CPU
Q616: An administrator needs to back up files
Q617: A blade chassis can hold 16 half-height blades
Q619: A technician has finished installing the operating
Q620: An administrator is backing up a database
Q621: A new server comes with four CPU
Q622: A server fails to boot. During POST,
Q623: A server is installed in a location
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents