A technician is responsible for overseeing twelve remote offices. There was a report of a power outage at one of the remote offices the night before, and now one of the servers there has not rebooted even though it was shut down gracefully. The technician was forced to travel two hours just to turn the server on. Which of the following is the MOST cost effective way to prevent future travel?
A) Install a generator onsite.
B) Install a remote management card in the server.
C) Install an uninterruptible power supply (UPS) onsite.
D) Move the server to the main office.
Correct Answer:
Verified
Q635: A technician is troubleshooting a server that
Q636: While preparing a server for a failed
Q637: The process of provisioning guest and host
Q638: A company has recently had sensitive data
Q639: An administrator is selecting hardware for a
Q641: An administrator is configuring a multi-terabyte storage
Q642: A server lost power and will not
Q643: The server administrator is finding a solution
Q644: A cable management arm should be used:
A)
Q645: A technician is installing a new blade
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents