To avoid the classic design mistake of "silver bullet syndrome," the analyst should _____.
A) increase the schedule to include learning time
B) move proposed changes into future versions
C) not switch or upgrade development tools unless there is a compelling need
D) not use a design tool that appears too good to be true
E) use rapid application development techniques or timeboxing
Correct Answer:
Verified
Q1: To avoid the classic design mistake of
Q2: Manipulating certain parameters to refine the way
Q4: The _ layer addresses how the software
Q5: The design phase of the SDLC creates
Q6: A(n) _ is the equivalent to a
Q7: To avoid the classic design mistake of
Q8: When an analyst discovers that a set
Q9: The following are all strengths of a
Q10: The process of building new systems by
Q11: There are three methods to create a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents