The Project Star Model identifies the key parameters in the design of project delivery organization as a whole:
-Structure
A) the design of the way information flows between the various teams deployed on the projects, and in particular the information loop.
B) the design of the set of reporting relationships within the project organization across the multiple teams from the different PBFs deployed on the project.
C) the alignment with the project delivery narrative in both shaping and delivery.
D) defines all the tasks that need to be executed to deliver the project output and is a function of the project mission as discussed above.
E) The ways in which teams and their members are rewarded for their contribution to the project
F) The skills required of the team members deployed on the project.
Correct Answer:
Verified
Q3: Project mission captures why the project is
Q4: Project shaping process is the linear process
Q5: Matching
The work breakdown structure is the basis
Q6: Matching
The work breakdown structure is the basis
Q7: Matching
The work breakdown structure is the basis
Q9: Matching
The Project Star Model identifies the key
Q10: Matching
The Project Star Model identifies the key
Q11: Matching
The Project Star Model identifies the key
Q12: Matching
The Project Star Model identifies the key
Q13: Matching
The Project Star Model identifies the key
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents