Completeness control is an integrity control that identifies when a value in a field is too large or too small.
Correct Answer:
Verified
Q11: Defining the technology architecture is part of
Q12: During analysis,analysts build models to represent the
Q13: Package diagrams are used primarily when designing
Q14: The majority of new systems today must
Q15: Designing a single user interface is now
Q17: Cowboy coding is one of the newer
Q18: The primary purpose of integrity controls is
Q19: The output of the design activities is
Q20: Since the design activities all interact with
Q21: Which is NOT an objective of integrity