A Short Bored Pile Foundation Works by Transferring the Building

Question 6

Multiple Choice

A short bored pile foundation works by transferring the building load


A) To a good loadbearing strata
B) To a poor loadbearing strata
C) To the water table
D) Over a wide area of the site
E) From a non-cohesive to a cohesive soil