Sunseel Industries produces two types of raw materials A and B, with a production cost of $4 and $8 per unit, respectively. The combined production of the raw materials A and B must be at least 700 units per month. At least 400 units of the raw material B and not more than 1200 units of the raw material A must be produced per month. The processing time for the raw material A is observed to be 5 hours and for B, it is found to be 4 hours. A total of 3000 such hours are available per month. How much of each raw material should be produced in order to minimize the cost. Develop a linear program that Sunseel Industries can use to determine how many units of each raw material to produce to minimize the total cost.
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q43: A manager of a quality testing team
Q44: Hire-a-Car System rents three types of cars
Q45: Robin Tires, Inc. makes two types of
Q46: Three plants P1, P2, and P3 of
Q47: Gatson manufacturing company produces 2 types of
Q49: Robin Tires, Inc. makes two types of
Q50: Ethan Steel, Inc. has two factories that
Q51: The supervisor of a production company is
Q52: A Cake & Pastry shop makes 3
Q53: A soft drink manufacturing company has 3
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents