Number the steps of evaluation for evidence-based projects in the order that they occur.
Steps of Evaluation for Evidence-Based Projects
1. Identify process and outcome variables of interest.
2. Determine methods and frequency of data collection.
3. Determine baseline and follow-up sample sizes.
4. Design data collection forms.
5. Establish content validity of data collection forms.
6. Train data collectors.
7. Assess interrater reliability of data collectors.
8. Collect data at specified intervals.
9. Provide “on-site” feedback to staff regarding the progress in achieving the practice change.
10. Provide feedback of analyzed data to staff.
11. Use data to assist staff in modifying or integrating the evidence-based practice change
-___ determine methods and frequency of data collection
Correct Answer:
Verified
Q16: The EBP team is attempting to formulate
Q17: Which approach is useful to evaluate an
Q18: Which is an electronic database for clinical
Q19: Sources of relevant research and related literature
Q20: What should a nurse researcher use to
Q22: Number the steps of evaluation for evidence-based
Q23: Steps of Evaluation for Evidence-Based Projects
Q24: Number the steps of evaluation for evidence-based
Q25: Number the steps of evaluation for evidence-based
Q26: Number the steps of evaluation for evidence-based
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents