A hotel is remodeling its lobby. The manager negotiated a contract for the work with a construction company and was about to sign it. The hotel manager then decided that installation of four additional wall plugs not referenced in the contract were needed. The owner of the construction company only orally agreed to add the four plugs. The hotel manager thereafter signed the contract, which did not make reference to the additional plugs. True or false: The hotel manager can enforce the company's promise to install the four extra plugs.
Correct Answer:
Verified
Q9: A void contract is unenforceable in court.
Q10: Which of the following has contractual capacity?
A)
Q11: A breach of contract is a crime.
Q12: Which of the following involves an intention
Q13: The Namberry Hotel had a minimum two-nights
Q15: A guest with a one-night guaranteed reservation
Q16: Jan made reservations at a hotel for
Q17: After an offer is made, a contract
Q18: Andrea had reservations at a hotel but,
Q19: Pain and suffering is recoverable in a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents