In RCA who should perform the analysis
A) People who have a problem and others from outside the area
B) Engineers
C) Managers
D) People with extensive training in all forms of RCA
Correct Answer:
Verified
Q1: In RCA you are trying to uncover:
A)
Q2: Why is it advantageous to have multiple
Q4: In defect elimination what is it called
Q5: Lean Maintenance and Defect Elimination are.
A) Closely
Q6: When making lists stay away from:
A) All
B)
Q7: When choosing the DE or Lean project
Q8: A good amount of DE and Lean
Q9: If I propose a DE project to
Q10: DE is primarily concerned with maintenance sources