Once submitted by the Constructor, the Design Professional will be held responsible for delays related to answering the RFI
Correct Answer:
Verified
Q17: Means and methods will
A) always be provided
Q18: The Spearin Doctrine
A) relieves the Contractor from
Q19: The Spearin Doctrine relieves Design Professionals from
Q20: A Subcontractor cannot be held responsible for
Q21: Generally specific will govern over general in
Q23: Warranties always start when the equipment is
Q24: Parol evidence carries more weight than most
Q25: Ambiguities can either be patent or inconsequential
Q26: Doubling the scope of the Contract could
Q27: The Architect is always allowed to make
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents