The activities have zero duration but are assumed to start at the same timeas the first and the end at the same time as the last one is called__________activity.
A) hijacked.
B) heuristic.
C) hammocked.
D) hole.
Correct Answer:
Verified
Q7: Which are the two levels of development
Q8: The statement "Putting more people on a
Q9: KLOC indicates _.
A)hundred lines of code.
B)source lines
Q10: Effort = _.
A)system size x productivity rate.
B)system
Q11: UFP indicates _.
A)unused function points.
B)unstructured function points.
C)uniform
Q13: _ activities on the network diagram have
Q14: Every risk is associated with a likely
Q15: Risk Management consists of _.
A)risk analysis and
Q16: Ranking of the risks and determining risk
Q17: _ = risk likelihood X risk impact.
A)risk
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents