In an NC Machining Operation, the Tool Has to Be

Question 6

Multiple Choice

In an NC machining operation, the tool has to be moved from point (5, 4) to point (7, 2) along a circular path with centre at (5, 2) . Before starting the operation, the tool is at (5, 4) . The G and N codes for this motion are


A) N010 GO3 X7.0 Y2.0 I5.0 J2.0
B) N010 GO2 X7.0 Y2.0 I5.0 J2.0
C) N010 GO1 X7.0 Y2.0 I5.0 J2.0
D) N010 GOO X7.0 Y2.0 I5.0 J2.0