For ordinary Portland cement, the initial setting time should not be more than
A) 30 minutes
B) 1 hour
C) 5 hours
D) 10 hours
Correct Answer:
Verified
Q6: The process of filling up all mail
Q7: Coping is defined as a
A)horizontal course of
Q8: Which of the following statement is correct?
A)The
Q9: The pitch of stair should never exceed
A)20°
B)25°
C)30°
D)40°
Q10: In a stretching bond
A)all the bricks are
Q12: Corbel is the extension of one or
Q13: The intermediate support of an arch is
Q14: If the water-cement ratio is low, the
Q15: The flooring made with small pieces of
Q16: Which of the following foundation is used
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents