After pre-stressing process is completed, a loss of stress is due to
A) Shrinkage of concrete
B) Elastic shortening of concrete
C) Creep of concrete
D) All the above
Correct Answer:
Verified
Q13: In a pre-stressed member it is advisable
Q14: An R.C.C. lintel is spanning an opening
Q15: The minimum clear cover for R.C.C. columns
Q16: An R.C.C beam of 25 cm width
Q17: If the bearing capacity of soil is
Q19: In a simply supported slab, alternate bars
Q20: If R and T are rise
Q21: If p1 and P2 are effective lateral
Q22: In the zone of R.C.C. beam where
Q23: Long and short spans of a two
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents