Job costing can also be called as ……………….. costing
A) Specific order costing
B) batch costing
C) Transport costing
D) Farm costing
Correct Answer:
Verified
Q14: The method of batch costing is used
Q15: Job costing is ………………………….
A)Method of costing
B)technique of
Q16: The method of costing applied in lathe
Q17: The method of costing applied in cycle
Q18: Job costing is applied when the product
Q20: For each job a …………………. Is given
Q21: In ……………… costing production is always made
Q22: Cost of product in each stage is
Q23: Un avoidable loss inherent in the material
A)Normal
Q24: Incidental residue from manufacture with recoverable value
A)Scrap
B)spoilage
C)Defective
D)loss