the form work from the underside of slabs, can be removed only after
A) 1 day
B) 4 days
C) 7 days
D) 14 days
Correct Answer:
Verified
Q12: the organic chemicals include epoxy resin, polyester
Q13: from given below, which method for the
Q14: in which method a refrigeration plan of
Q15: _ process consists of making a number
Q16: the formwork from the sides of beams
Q18: the arrangement of supporting an existing structure
Q19: a temporary rigid structure having platforms to
Q20: pyramid is a type of _ structure.
A)Triangulated
B)Massive
C)Pneumatic
D)Framed
Q21: Pneumatic structure contains:
A)Metal
B)Water
C)Wood
D)Compressed air
Q22: _ is a self-propelled machine which is