A runoff river plant is
A) a low head scheme
B) a medium head scheme
C) a high head scheme
D) none of the above
Correct Answer:
Verified
Q9: A river training work is generally required
Q10: A river bend characterized by silting
A)scouring on
Q11: Select the incorrect statement.
A)Intensive irrigation should be
Q12: A land is known as waterlogged
A)when the
Q13: Lining of irrigation channels
A)increases the waterlogging area
B)decreases
Q15: The net speed under which the turbine
Q16: A runoff river plant
A)is a medium head
Q17: The net head under which the turbine
Q18: The ratio of the average load to
Q19: A hydroelectric scheme operating under a head