When the quantity of the earth is much in excess of the quantity required for filling, it has to be deposited in the form of spoil banks. The spoil banks are made on
A) the right side
B) the left side
C) both the sides
D) all of these
Correct Answer:
Verified
Q14: In case of syphon aqueduct, the H.F.L.
Q15: A canal head work in rocky stage
Q16: Non-silting, non-scouring velocity is called
A)mean
B)critical
Q17: Sprinklar irrigation is adopted for
A)level
B)uneven
C)hilly
Q18: In a Sarda type fall, the trapezoidal
Q19: The flexibility of a sub-proportional outlet is
Q20: A part of water which will move
Q21: In level crossing, the water level of
Q22: The length of groyne depends upon the
Q24: Irrigation
A)increases
B)decreases
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents