A.C. network analyser is used to solve problems of
A) load flow
B) load flow and short-circuit
C) load flow and stability
D) load flow, short-circuit and stability
Correct Answer:
Verified
Q2: The interaction between a transmission line and
Q3: When a wave propagates on a transmission
Q4: Which of the following statements is incorrect?
A)Station
Q5: Discrimination between main and back up protection
Q6: Induction cup relay is operated due to
Q8: Which of the following statements is incorrect
Q9: Short-circuit currents are due to
A)single phase to
Q10: To reduce short circuit fault currents are
Q11: Bus coupler is very essential in arrangement
A)single
Q12: For cost and safety, the outdoor substations