Select the incorrect statement.
A) The progress of work in low level method of mound construction is very slow
B) Barge method of mound construction is economical
C) In low level method of mound construction, the area of working is limited
D) In staging method of mound construction, the work is not interrupted even during stormy weather
Correct Answer:
Verified
Q8: The difference in height between highest high
Q9: When a ship floats at its designed
Q10: By increasing the rise of lock-gates,
(i) The
Q11: For designing the dock, the proportion of
Q12: When a wave strikes a vertical breakwater
Q14: Pick up the correct statement from the
Q15: The significant wave height is defined is
Q16: The fixed mooring does not require
A)Mooring post
B)Bollard
C)Anchors
D)Capstan
Q17: A ship is berthed in a chamber
Q18: Due to the impact of water wave
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents