What correction must be made to a measured slope distance prior to calculating state plane coordinates?
A) Reduce measured slope distance to a horizontal distance at a known elevation.
B) Correct the horizontal distance to a geodetic distance.
C) Correct the geodetic distance to a grid distance.
D) All of the above
Correct Answer:
Verified
Q11: What tool is typically needed to see
Q12: Currently, which of the following ellipsoids is
Q13: The National Geodetic Survey defines which of
Q14: The convergence angle varies with which of
Q15: Assuming the radius of the Earth is
Q16: Which of the following is not a
Q18: What type of orbit around the Earth
Q19: Which of the following statements related to
Q20: If the magnetic azimuth (from north) of
Q21: Magnetic declination is which of the following?
A)The
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents