All but one of the following items are included in the Design phase of the construction process. Which one is not included?
A) Predesign
B) Schematic design
C) Design development
D) Construction documents
Correct Answer:
Verified
Q4: The Schematic Design (SD) phase in construction
Q5: LEED-certified buildings are designed to do all
Q6: All LEED Professional Credentialing exams assess candidates'
Q7: Life-cycle cost analysis looks at the cost
Q8: In conventional design and construction processes, project
Q10: During the construction administration phase, which one
Q11: Recommissioning, along with occupant surveying (via a
Q12: A project team member is detailing the
Q13: In a project, the construction documents phase
Q14: The sequential order of construction phase is