A description of the background/history of the project, the use(s) of the building in detail, the location and surrounding area of the building , and any other project attributes the team would like to highlight is called:
A) LEED description
B) LEED intent
C) project narrative
D) project boundary
Correct Answer:
Verified
Q49: One of the team members working on
Q50: Once a project team submits design and
Q51: A LEED Professional had submitted false data
Q52: How many LEED Rating Systems are available?
A)4
B)10
C)11
D)12
Q53: What is the procedure required to achieve
Q55: A candidate is eligible to be LEED
Q56: Which of the following is not one
Q57: S. General Services Administration requires that all
Q58: The value of green building construction is
Q59: Integrative designs where rainwater is captured for
Unlock this Answer For Free Now!