A project team is considering the points in the Sustainable Site section for a LEED for Commercial Interior project and the following credits have been evaluated with the exception of:
A) Selecting a LEED-certified building to occupy the tenants
B) Locating a space with bicycle storage to allow occupants the option for alternative transportation
C) Reusing the captured storm water for toilets
D) Reducing the water use for the building
Correct Answer:
Verified
Q1: The four key issues to help define
Q2: To develop an appropriate sustainable site, one
Q3: Which of the following is not a
Q4: To support alternative transportation, one is encouraged
Q5: A sustainable site includes all of the
Q7: Which of the following sites is the
Q8: A disused gasworks site with soil contamination
Q9: To channel development to urban areas with
Q10: A project team member is calculating the
Q11: A design team is strategizing on building
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents