A lean process initiative has a production time for plastic extrusion with a baseline of 17 minutes. They do a pilot test time of 6.1 minutes and 5.4 minutes in the control phase. Calculate the percentage of improvement from the baseline.


A) The percentage of improvement is 40%.
B) The percentage of improvement is 68%.
C) The percentage of improvement is 54%.
D) The percentage of improvement is 32%.

Correct Answer:

verifed