A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
A) 500 m3
B) 1000 m3
C) 1500 m3
D) 2000 m3
Correct Answer: