During the detailed survey of a hill road, the first operation is to fix the bench marks.
Correct Answer:
Verified
Q15: A lamniscate fulfils the requirements of a
Q16: The distance, measured along the centre line
Q17: A gradient at which no tractive force
Q18: The theoretical capacity of a highway depends
Q19: The factor which influences the design of
Q21: A camber of 1 in 30 means
Q22: The design criterion for the valley curves
Q23: The main advantage of concrete pavements is
Q24: For cement concrete roads, a minimum gradient
Q25: The design capacity of the road may