In water-bound Macadam roads
A) small broken stones are laid in two layers
B) voids between the stones are filled by stone dust
C) camber for drainage is given at the formation level itself
D) all of the above
Correct Answer:
Verified
Q10: For transportation purposes in India, the first
Q11: Which of the following statement is wrong?
A)A
Q12: The slope of the line joining the
Q13: For the water-bound macadam road, the recommended
Q14: The total rise or fall between any
Q16: The opportunities to cross slow moving traffic
Q17: The Central Road Research Institute is controlled
Q18: For walls more than 6 m in
Q19: The side drains are provided on both
Q20: The longest road constructed during the time