In Telford construction, the side portions were made up of only one layer of broken stones and levelled off to give a camber not greater than
A) 1 in 40
B) 1 in 60
C) 1 in 80
D) 1 in 120
Correct Answer:
Verified
Q7: The higheay capacity is expressed in passenger
Q8: In the absence of super-elevation on road
Q9: Highway density is defined as the total
Q10: Level crossing' is a
A)regulatory sign
B)warning sign
C)informatory sign
D)none
Q11: A cubic spiral is
A)superior
B)inferior
Q13: Steeper camber may cause deterioration of the
Q14: The city roads which are meant for
Q15: The maximum number of vehicles that can
Q16: The importance of roads in a country
Q17: The thickness of the parapet wall, on
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents