Under the Clean Air Act, if a plant owner plans to build a plant in a "clean air area" he:
A) does not need a preconstruction permit from the EPA or the state agency that enforces the Act
B) needs a preconstruction permit from the EPA or the state agency that enforces the Act
C) does not need to get any permits until after construction begins
D) can begin construction with no permit if he pays a fee to the state agency that enforces the Act
E) none of the other choices are correct
Correct Answer:
Verified
Q268: The maximum allowable increase of air pollution:
A)
Q269: Which of the following things is NOT
Q270: Under the Clean Air Act, the standards
Q271: New plants may be built in Prevention
Q272: The maximum allowable increase of air pollution:
A)
Q274: Under the Clean Air Act, which of
Q275: Prevention of Significant Deterioration (PSD) areas under
Q276: Which of the following things is NOT
Q277: The State Implementation Plans required by the
Q278: Every State Implementation Plan for air quality
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents