The main purpose of providing camber is
A) to collect storm water
B) to maintain equilibrium
C) to follow irc specifications
D) to follow geometric specifications
Correct Answer:
Verified
Q10: The extra width of pavement is provided
Q11: Transition curve is introduced in
A)horizontal curve
B)circular curve
C)between
Q12: The most important factor that is required
Q13: The design speed of NH on a
Q14: A part of pavement raised with respect
Q16: The legal axle load of the design
Q17: In India, the type of traffic assumed
Q18: The final choice of stabilisation technique is
Q19: The flexural strength is based on
A)irc
B)plate test
C)cbr
D)shear
Q20: How many types of challenges are encountered
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents