In order for JIT/LEAN/Lean to bring about all the benefits inherent in its philosophy, it must be part of a total quality system.
Correct Answer:
Verified
Q1: JIT/LEAN/Lean minimizes production lot sizes.
Q3: In a JIT/LEAN/Lean production facility, the supplying
Q4: In a JIT/LEAN plant, there is no
Q5: Automation is being superseded by JIT/LEAN/Lean in
Q6: The JIT/LEAN/Lean "pull" system ensures that:
A) Costs
Q7: Which of the following individuals are identified
Q8: Reduced setup times are essential for:
A) Supporting
Q9: It is critical that machines used in
Q10: Which of the following are NOT consistent
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents