The design process should identify ____ to be removed and existing or potential storm drainage problems.
A) native plants
B) invasive plants
C) non-native plants
D) non-invasive plants
Correct Answer:
Verified
Q2: Development near _ should be avoided.
A) mature
Q3: Most traditional landscapes are _.
A) neither resource
Q4: _ can be used for recreation, to
Q5: Every impervious surface on a site increases
Q6: Traditional impervious paved surfaces can be part
Q7: Pervious concrete is placed over a gravel
Q8: Pervious asphalt is installed with _.
A) an
Q9: Pavers can be made of concrete, brick,
Q10: _ grids, strong enough to support vehicle
Q11: Reflectivity, or albedo, is measured _.
A) as