In comparing a just-in-time system with material requirements planning, JIT is a push system of production control, whereas MRP is a pull system:
Correct Answer:
Verified
Q15: With which of the following manufacturing resources
Q16: Plant capacity adjustments that can be made
Q17: The three modules in shop floor control
Q18: Machine loading refers most closely to which
Q19: Small batch sizes are made economically feasible
Q21: The word kanban is most closely associated
Q22: Autonomation refers to the design of production
Q23: In lean production, which of the following
Q24: Of the following types of maintenance, which
Q25: In lean production, which of the following