The _______________ is the main vertical drain pipe that begins with its connection to the building drain and terminates with its connection to the stack vent.
Correct Answer:
Verified
Q10: All codes dictate that no vent be
Q11: Many codes state a building drain must
Q12: All relief vents are sized based on
Q13: A fixture drain installed aboveground is sized
Q14: MATCHING
Match the following terms:
-Pipe circulating air between
Q16: Most codes only allow a maximum of
Q17: Layout for a DWV system is typically
Q18: The IPC and UPC have some different
Q19: Most codes dictate that the stack vent
Q20: Most codes allow a 2" fixture drain
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents